toward100

Toward 100 Update: And now for something completely different...

Toward 100 Update: And now for something completely different...

AAA-1 Masonry has begun tuck pointing the southern elevation of the sanctuary. This is what is known as a 100% grind out so all the new mortar joints will be the same color and uniform thickness. In short, putting out best face to the public. The east and west elevations have had much less harsh weather exposure and will be ground out and tuck pointed where needed.

HTLakeview Air Conditioning Installation Nearly Complete

HTLakeview Air Conditioning Installation Nearly Complete

"All in all it's just another [hole] in the wall."

When you next visit the sanctuary you will notice that the inside portion of the air conditioning system is in place, if not yet working. Positioning the interior units was easy. Connecting them to the outside compressors was art. To do this holes had to be drilled -- in the floor, in the foundation, in the balcony. All were drilled with a precision that will ultimately be unseen but greatly appreciated by those of us who struggle with getting the hole just right when hanging the latest family portrait.

All is on schedule and we hope to be able to use the air conditioning for the first time on July 28.